top of page

Interior Framing / New Residential Construction Asheville, NC.

Aug 19, 2024

1 min read

0

1

0

On Feb 16, 2024 Lehman Construction LLC. finished exterior wall framing and started interior wall framing. Exterior framing is done with 2" by 6", while interior framing is typically done with 2" by 4". Unless the wall is behind a sink, shower or toilet. In that case a interior 2" by 6" is used.




Comments

Share Your ThoughtsBe the first to write a comment.
bottom of page